Contract Company Start Date End Date Notes
2018 Videography Services Global Media South,LLC February 27, 2018 2021-02-27
2017 Culverts Cimsco, Inc. 01/01/2017 2018-12-31
2017 Culverts Baton Rouge Winwater Works Co. 01/01/2017 2018-12-31
2017 Granular Chlorine Leslie's PoolMart 01/01/2017 2018-12-31
2017 Liquid Chlorine & Sulfur Dioxide Requirements DPC Enterprises, L.P. 01/01/2017 2018-12-31
2017 Street Lighting Materials and Supplies Notoco Industries 07/26/2017 2019-07-26
2017 Street Lighting Materials and Supplies Scurlock Electric, LLC 07/26/2017 2019-07-26
2017 Street Lighting Materials and Supplies Watertech Corporation 07/26/2017 2019-07-26
2017 Street Lighting Materials and Supplies Pemba, Inc. 07/26/2017 2019-07-26
2017 Structural Firefighters' Bunker Gear BGS, LLC 01/01/2017 2018-12-31
2017 Warehouse Water & Sewer Fittings & Supplies Baton Rouge Winwater Works Co. 01/01/2017 2018-12-31
2017 Warehouse Water & Sewer Fittings & Supplies Cimsco, Inc. 01/01/2017 2018-12-31
2017 Warehouse Water & Sewer Fittings & Supplies Coburns Supply 01/01/2017 2018-12-31
2017 Warehouse Water & Sewer Fittings & Supplies Consolidated Pipe & Supply 01/01/2017 2018-12-31
2017 Warehouse Water & Sewer Fittings & Supplies HD Supply Waterworks 01/01/2017 2018-12-31
2017 Warehouse Water & Sewer Fittings & Supplies Southern Pipe & Supply 01/01/2017 2018-12-31
2018 Adjudicated Properties - CEA St. John District Attorney's Office January 9, 2018
2018 Asphalt Road Improvements Coastal Bridge Company, LLC January 9, 2018 2018-12-31
2018 Bucket Truck Altec Industries June 12, 2018 0000-00-00
2018 Bus Transportation for Summer Feeding Program - CEA St. John school Board June 4, 2018 2018-07-20
2018 Disaster Debris Monitoring Services Tetra Tech Inc. June 26, 2018 2022-06-26
2018 Feasibility and Conceptual Plan for Passenger Rail Study AECOM TECHNICAL SERVICES, INC January 9, 2018 2019-01-09
2018 Fuel Requirements Richard Oil and Fuel, L.L.C January 1, 2018 2018-12-31
2018 NPS HISTORIC STRUCTURES SURVEY – PHASE 2 R.Christopher Goodwin & Assoc. January 23, 2018 2018-08-14
2018 Pump and Maintenance Repairs Renewal 1 Industrial Coil, LLC April 1, 2018 2019-03-30
2018 Removal & Replacement of Concrete Sidewalks, Driveways, and Damaged Street Sections Parish wide LA Contracting Enterprise, LLC July 24, 2018 2019-12-31
2018 Safe Room Architect Sizeler Thompson Brown Architects March 26, 2018 - Upon Completion
2018 Self Priming Pumps &Related Materials Delta Process Equipment March 14, 2018 2018-12-31
2018 Servitude Agreement Belle Terre Land, LLC June 26, 2018 2019-12-26
2018 Sewer Submersible Pumps and Related Materials Gulf State Engineering Co., April 27, 2018 2018-12-31
2018 Woodland Bridge Rehabilitation Buck Town Contractors & Co. May 8, 2018
2018 Woodland Bridge Rehabilitation Principal Engineering, Inc. July 10, 2018 0000-00-00
911 Dispatch Equipment Service Agreement Motorola Solutions 8/1/2018 2019-07-31
911 Vesta System Upgrade Motorola Solutions, Inc. 6/25/15 - Upon Project Completion Upon Project Completion
Administration of Homeland Security/GOHSEP Grant South Central Planning and Development Commission 5/13/16 - no expiration date 0000-00-00
Airport Road Lease Agreement Exelis, Inc. June 19, 2013 - No Termination Date 0000-00-00
Airport Road Wastewater Collection, Pump Station, and Force Main System - Engineering Services Professional Engineering Consultants Corporation June 11, 2013 - Upon Project Completion 0000-00-00
Ambulance Services Acadian Ambulance Oct 1, 2014 2019-09-30
Americans with Disabilities Act (ADA) Coordinator Services A & E Enterprise Management, LLC 01/18/2017 2020-01-17
Backflow Prevention Services Backflow Prevention Services, LLC December 9, 2014 2019-12-09
Batteries CEA St. John the Baptist Parish Sheriff's Office April 9, 2013 - no termination date 0000-00-00
Belle Terre Ponds CEA Belle Terre Country Club November 9, 2015 - upon project completion 0000-00-00
Bio-Mass & Wood Waste Disposal Facility Crochet Equipment Co, INC May 14, 2009 2019-05-13
Bond Issue Drainage Project Engineering Services Shread-Kuyrkendall & Associates December 8, 2005- Upon Project Completion 0000-00-00
CDBG Disaster Recovery Program Implementation - Hurricane Isaac Louisiana Office of Community Development May 29, 2013 2020-03-31
CDBG Hurricane Isaac Housing Repair Program Inspection Services No. 3 Pivotal Engineering,LLC August 25, 2017 2018-08-25
CDBG Hurricane Isaac Housing Repair Program Inspection Services No. 4 Pivotal Engineering October 14, 2018 2019-10-13
CDBG Small Business Grant and Loan Program Management South Central Planning and Development July 28, 2015 2024-02-01 Addendum No.1 CDBG Recovery
Chemical Control & Canal Maintenance Addendum No. 1 Roussel's Land-Care Services, Inc 11/12/14 2018-11-11
Code Enforcement Officer Henry Joseph 2017-09-25 2018-09-24
Code Enforcement Officer Ronald D. Comminie 11/27/2017 2018-11-26
Code Enforcement Officer Lewis Grady May 1, 2018 2019-04-30
Code Enforcement Officer Patricia Ballansaw May 9, 2018 2019-05-08
Code Enforcement Officer Henry Joseph September 25, 2018 2019-09-24
Community Development Block Grant CEA LA Division of Administration Office of Community Dev. March 19, 2009 - No Termination Date 0000-00-00
Contractor for Professional Services Pivotal Engineering, LLC October 9, 2018 2019-10-13
Cooperative Endeavor Agreement The Voodoo Boat Club January 1, 2018 2018-12-31
Disaster Recovery Consulting Service Royal Engineers and Consultants,LLC 04/01/2017 2019-03-31
Disaster Restoration Services Emergency Restoration Inc. (ERI) 07/28/2017 2020-07-28
Disposal Agreement for Landfill River Birch Landfill October 2, 2000 2020-10-02
East Bank Waterline Interconnection CEA St. Charles Parish Government August 26, 2013 - No Termination Date 0000-00-00
Ecological Baseline Study Meyer Engineers, Ltd. Nov. 12, 2014 to Nov. 11, 2016 or Upon comple 0000-00-00
Edgard Library Renovation and Addition M & H Builders, Inc. 3/31/2016 - 11/30/16 (240 days from Notice to 0000-00-00
Edgard Treatment Plant Water Clarifier Rehabilitation Volute Inc 4/24/2018 0000-00-00
Edgard Water Treatment Plant Clarifier Rehabilitaion Project CH2M Hill Engineers, Inc. 07/25/17 2019-07-25
Elevation of Electrical Components- Engineering Services C.J. Savoie Consulting Engineers January 13, 2015 - March 12, 2016 0000-00-00
Emergency Animal Services - MOU Louisiana State Animal Response Team 05/27/2016 2019-12-31
Emergency Generator at Three(3) Wastewater Collection Station - Engineering Services Gulf Engineering & Consulting - G.E.C. INC 12/12/2017 - Upon Satisfactory Completion 0000-00-00
Emergency Generators at Wastewater Treatment Facilities and Pumping Stations - Engineering Services Gulf Engineers & Consultants (G.E.C., Inc.) May 20, 2013 - Upon Project Completion 0000-00-00
Emergency Response, Management, And Recovery Services-Renewal No.2 Crowder Gulf June 1, 2018 2019-05-31
Emergency Standby Generators Castay, Inc. 06/15/2016 2019-06-14
Employment Verification Services Equifax August 11, 2015 - No Terminiation Date 0000-00-00
Engineering Support & Grant Management Amendment No. 5 Digital Engineering August 28,2018 - Upon completion
Engineering Support & Grant Mangement Amendment No. 3 Digital Engineering and Imaging, Inc. April 28, 2014 - upon grant completion 0000-00-00
Environmental Consulting Services - Addendum No.1 Recordation Curtis Environmental Services, Inc February 11, 2014 2019-02-11
Essential Service Safe Room Onshore Construction,LLC October 10, 2018-334 days after commencement
Farm/Agricultural Lease Agreement M. Hymel & Sons 08/08/2017 2027-08-09
Ferry Vessel & Landing Barges CEA Louisiana Department of Transporation and Development October 9, 2013 - No Termination Date 0000-00-00
Financial Auditing Carr Riggs & Ingram November 28, 2017-Completion of 2017 Audit
Financial Software System Tyler Technologies, Inc. 11/16/2017 No Expiration Date
Fire Department Payroll Management Personnel Management Inc June 30, 2004- yearly w/renewal option 0000-00-00
Fire Service - MOU St. John The Baptist Sheriff's Office 2017-09-12
Fire Service Lease Purchase Agreement-Radios Motorola Solutions July 25, 2017 2022-07-15
Garyville Timbermill Trail Engineering Services - Phase I & II Meyer Engineers, Ltd. July 19, 2012 - Upon Project Completion 0000-00-00
Garyville Timbermill Trail Phase II Barriere Construction Company 06/15/2016 2019-06-15
GPS Services Nextraq September 8, 2015 2018-11-08
Grant Agreement - Gulf Coast High Speed Rail Station Southern Rail Commission 08/08/2017 2019-02-28
Haydel Canal Drainage Improvements Shread-Kuyrkendall & Associates, Inc. April 16, 2014 - Upon Project Completion 0000-00-00
Health Care Services CEA St. James Parish Hospital June 10, 2014 - No Termination Date 0000-00-00
Homeland Security and Emergency Preparedness Assistance American Red Cross June 1, 2016 - December 31, 2020 0000-00-00
Humana Medicare Advantage Employer Plan Renewal Humana 01/18/2018 2018-12-31
Humana Medicare Advantage Employer Plan Renewal Humana 01/18/2018 2018-12-31
Hurricane Isaac Community Development Block Grant CEA LA Office of Community Development - Disaster Recovery Unit May 29, 2013 - March 31, 2020 0000-00-00
IT Services ACT Technologies June 1, 2015 2020-05-31
Janitorial Services Enmon Enterprises, L.L.C. D/B/A Jani King March 26 2014 2019-03-26
Juvenile Detention Housing Terrebonne Parish Juvenile Justice Complex 10/03/2016 - No termination date 0000-00-00
LA DHH Drinking Water Loan Administration & Management Amendment No. 2 Digital Engineering November 13, 2012 - Upon Project Completion 0000-00-00
LaPlace Water Source - Engineering Digital Engineering & Imaging, Inc. August 12, 2014 -upon completetion 0000-00-00
Lease Agreement St. John Theatre 01/12/2017 2027-01-12
Legislative Liaison Services Guidry Associates, LLC 3/1/2017 2018-10-01 This Contract was cancelled effective 10/1/18. See the cancellation contract
Legislative Liaison Services Guidry Associates, LLC 2018-10-01 2018-10-01 Cancellation Letter and motion
LGAP Funding Agreement-Renovation/Rehabilitation of Buildings Office of Community Development; Louisiana Gov. Assistance Program 6/23/2016 2019-06-22
LiDAR Aerial Imaging Pictometry International Corp. 09/15/16 - upon completion 0000-00-00
Lions Water Treatment Plant Pump Station Intake Project - Engineering Services Burk Kleinpeter, Inc. March 13, 2014 - Upon Project completion 0000-00-00
LSU Ag Center LSU Cooperative Extension Service 01/01/16 - 12/31/20 0000-00-00
Lucy Levee Trail Project Phase 1 Barriere Construction August 28, 2018 - 60 days after notice to pro
Main Waste Water Pump Station Professional Engineering Consultants 11/29/2016 - upon completion 0000-00-00
Manchac Greenway Commission Tangipahoa Parish and St. John Parish 12/7/2016 0000-00-00 No Termination Date
Mapping Pictometry International October 16, 2014 2020-10-15
Mass Notification System Black Board Connect 06/26/2018 2022-06-26
Membrane Filter Fro Reverse Osmosis Unit LG NanoH2O, Inc. 6-12-18 2020-05-22
Miss River Trail Phase 4 Agreement Louisiana Department of Transportation and Development 7-10-2018 0000-00-00
Mississippi River Multi-Use Trail, Phase 4 - Design Meyer Engineers, LTD April 21, 2015 0000-00-00
Mississippi River Trail, Phase 3 Department of Transportation and Development June 18, 2014 - Upon Completion of Project 0000-00-00
Mosquito Abatement St. John Mosquito Control 07/01/2017 2022-07-01
Nalco Chemical Company Lease Agreement for Mt. Airy Fire Dept. Property Nalco Chemical company October 1, 2009 2029-10-01
Occupational Health Services Ochsner Medical Center November 1, 2017 2020-10-31
Parish Engineering Services C.J. Savoie Consulting Engineers, Inc. January 1, 2015 - December 31, 2018 0000-00-00
Parish Surveillance Cameras CEA - St. John Parish Sheriff's Office 06/30/16 - 05/31/2020 0000-00-00
Parking Lease Agareement Carville-Lasseigne, LLC 08/12/2017 2018-08-11
Peavine Boat Launch - Engineering Services Burk-Kleinpeter, Inc. May 28, 2013 - December 15, 2016 0000-00-00
Percy Hebert Polling Location Change South Central Planning and Development Commission September 25, 2018 2018-12-25
Pleasure Bend Water System Volute, INC 10/30/2017- Upon Completion of Projection
Pleasure Bend Water Treatment Facility Project Environmental Engineering Services, Inc. 11/29/2016 - upon completion 0000-00-00
Professional Services Agreement - Graduate Worker University of New Orleans August 20, 2018 2019-07-30
Professional Services for La. Community Dev. Block Grant Program South Central Planning Commission July 28, 2009- Upon Project Completion 0000-00-00
Property Lease - LaPlace Volunteer Fire Department MD Manson Properties, LLC 03/10/2016 - 09/01/2016 0000-00-00
Pump Maintenance and Repairs Industrial Electric Coil, LLC April 28, 2015 - March 30, 2018 0000-00-00
Pump Maintenance And Repairs - Assignment of Contract Louisiana AAB Electrical Industries,Inc 7-19-2018 0000-00-00
Pump Maintenance And Repairs Renewal No. 1 AAB Electrical Industries, Inc. 2/27/2018 2019-03-30
Recreation Dept. Bus Transportation Agreement St. John the Baptist Parish School Board 06/30/2017 2020-06-29
Regional Mass Transit System River Parishes Transit Authority January 1, 2016 - December 31, 2018 0000-00-00
Reimbursement Agreement Shell Pipeline Company LP 07/19/2017 2020-07-19
Relocation of Utilities Engineering Services GSA Consulting Engineers, Inc. January 22, 2013 - Upon Project Completion 0000-00-00
Repairs to Senior Citizen Center Yeates & Yeates Architects, LLC Oct 10, 2014 - upon project completion 0000-00-00
Reserve Area Drainage (Phase 2) Engineering Services Shread Kuyrkendall & Associates, Inc. April 9, 2013 - Upon Project Completion 0000-00-00
Reserve Area Drainage (Phase 2) Engineering Services Amendment Shread-Kuyrkendall & Associates, Inc. 4/24/2018- upon completion 0000-00-00
Reserve Drainage Project - Phase III Engineering Buchart Horn, Inc. October 13, 2014 - March 7, 2017 0000-00-00
Reserve Drainage Project -Phase III Engineering Amendment No. 2 Buchart Horn, Inc 2/2/2015 0000-00-00
Reserve To I-10 Connector IJR Regional Planning Commission December 21, 2017
Reserve WasteWater Treatment Plant - Change Order 3 The Lemoine Company, LLC October 9, 2018 2018-10-31
Reserve Wastewater Treatment Plant Change Order 2 The Lemoine Company, LLC 05/15/2018 2018-10-31
Reserve Wastewater Treatment Plant- Agreement The Lemoine Company May 1, 2017 2018-10-31
Reserve Wastewater Treatment Plant- Change Order No.1 The Lemoine Company, LLC 10/31/2017 2018-10-31 540 days after start date
Right of Way & Servitude Cypress Gas Pipline 12/10/17 2018-12-09
River Forest Canal Extension - Engineering Services Burk-Kleinpeter Inc. January 13, 2015 - March 12, 2016 0000-00-00
RIVER ROAD WWTP EFFLUENT PUMP STATION CONTROLS BURK-KLEINPETER,INC March 13,2018 - Upon completion
Route LA 643 Cooperative Endeavor Agreement Department of Transportation And Development September 19, 2018 2018-09-28
Safe Room Engineering Services Siezler Thompson Architects Aug 27, 2014 - upon project completion 0000-00-00
Sanitary Sewer Evaluation Survey Compliance EnviroSystems April 24, 2016 - April 23, 2019 0000-00-00
Senior Citizens' Center Duplantis Design Group, PC Sept 23, 2014 - upon project completion 0000-00-00
Servitude Agreement & Recordation Delta Lands Services, LLC 07/01/2017 0000-00-00
Servitude of Passage CVM Holding Company, Inc. April 27, 2016 - No Termination 0000-00-00
Shell Potable Water Line Project N-Y Associates, Inc. 06/30/2017 2019-06-30
Sign Language Interpreting Agreement Deaf Action Center of Greater New Orleans 05/01/2017 2020-05-01
SJBP Lions/Laplace Reserve Osmosis Piloting Project CDM Smith Inc. December 14, 2016 2018-12-14
Small & Emerging Business Development Program Louisiana Economic Development 07/01/2017 2020-06-30
Small & Emerging Business Development Program Renewal No. 1 Xavier University May 24, 2017 2019-05-24
Solid Waste Collection & Removal Metro Service Group, Inc. 08/01/2016 - 07/31/2021 0000-00-00
South Central Planning and Development CEA-LA State Uniform Construction Code-Amendment No.1 South Central Planning and Development Commission August 28,2018 2021-08-28
South Central Regional Construction Code Compliance Program South Central Planning & Development Commission 1/27/2017 2020-01-26
Sprint Cell Tower Site Lease Agreement Sprint Spectrum Realty Company, L.P. May 16, 2005- September 29, 2049 0000-00-00
St John Parish Government Complex Building - Change Order No. 5 Lamar Contractors, LLC 6-27-2018
St. John Parish Government Complex Building Lamar Contractors, LLC 06/30/2016 2018-05-21
St. John Senior Citizens' Center LA Contracting Enterprises, LLC 07/13/2016 - 01/13/2017 0000-00-00
St. John USDA Service Center Lease Agreement USDA January 1, 2016 - December 31, 2018 0000-00-00
State of Louisiana Emergency Re-Entry Access Plan Memorandum of Agreement The Parishes of Orleans, Jefferson, St. Bernard & Plaquemines August 15, 2006- No Termination Date
Storage A Storage Inn monthly 0000-00-00
Sub-recipient Funding Agreement Governor's Office of Homeland Security & Emergency Preparedness (GOHSE 02/22/2017-No Termination Date 0000-00-00 No End Date
Teche Action Clinic-CEA Teche Action Board, Inc. 12-12-2017 2022-12-12
Two-Way Radio System Intergovernmental Agreement Communications District & Ascension Parish January 8, 2013- No Termination Date 0000-00-00
Uniform Service Cintas Corporation August 12, 2014 2019-08-12
US 61 Improvements - Engeering Services Buchart Horn, Inc. July 30, 2009- Upon Project Completion 0000-00-00
Utilities Level of Service Assessment Extension No 1 Stantec Consulting Services Inc. September 28, 2018 2019-09-27
Utility Easement & Servitude Right Of Way Port of South Louisiana August 15, 2013 - No Termination Date 0000-00-00
Veterinary Services Dr. Randi Adams Breckenridge, DVM 06/30/2017 2020-06-29
Vicknair Canal Drainage Project Shread-Kuyrkendall & Associates, Inc. 2/27/2018 - Upon Project Completion 0000-00-00
Wastewater Manhole & Line Rehabilitation - Engineering Services Professional Engineering Consultants August 1, 2011 - Upon Completion of LDEQ Loan 0000-00-00
Water Meter Reading and Billing System Agreement Digital Engineering and Imaging October 24, 2017 - Upon Completion
Water System & Mapping CH2MHILL February 23, 2000 2020-02-23
West Bank Public Safety Complex - CEA St. John The Baptist Sheriff's Office 2017-10-10 2020-10-10
West Bank WWTP Tank Rehabilitation Project C&S Consultants, Inc October 6, 2017 - Upon Completion of Project
West Shore Lac Des Allemands Engineering Services Glenn G. Shaheen & Associates, Inc. May 3, 2010 - Upon Project Completion 0000-00-00